The Proposals
The emerging landscape-led masterplan seeks to fully integrate with the village and respond sensitively to the surrounding landscape.
Key elements of the emerging masterplan include:
- Delivery of up to 140 homes, including 35% affordable homes (subject to further design and technical work)
- A mix of housing types including 1, 2, 3 and 4 bed homes catering for local families and younger first-time buyers enabling the village to encourage people to remain and return to the village.
- Landscape led design, with housing heights that respect the local surroundings and work with local topography.
- Open space provision, providing onsite leisure and wellbeing opportunities.
- Providing new play spaces space for children to play and families to socialise.
- Improved walking and cycling routes to better connect this part of Charminster with local services.
- Enhancing local resilience to heavy rainfall, via a drainage strategy to improve the way surface water is managed on the site.
- Providing additional patronage to support and sustain existing village services.
Design Principles
- Generous green open space, protecting views across the valley and connecting to Princes Plot.
- Retained boundary hedgerows and trees, providing natural screening.
- Separation from Ellerslie Close and landscape buffers to provide privacy.
- Drainage features to manage surface water and support birds and other wildlife.
- Avoid rigid boundaries by feathering development into green spaces.
- A network of pathways connecting into the village and wider footpath network.
- Maintain key views toward the village and conservation area through a sensitive layout, that respects local heritage and landscape.
- Integrate the development into the village by clearly defined arrival space, central green and internal streets.